โ† All Models/105A-THE ORBIT
Model 105A

105A-THE ORBIT

A modern two-storey home designed for elevated living, flexibility, and comfort. Featuring 1,570 sq ft of thoughtfully planned space with 3 bedrooms, 3 bathrooms, a dedicated office, and expansive glass-railed outdoor decks, The Orbit blends open-concept design with seamless indoor-outdoor living. Perfect for families, entertaining, or creating your ideal work-from-home lifestyle.

1570
sq ft
3
Bedrooms
3
Bathrooms
$241K
DIY From
$462K
Installed From
105A-THE ORBIT โ€” exterior
Quick Specifications
Footprint
1570
Building Size
24 X 38
Roofing
I Joists
BC Step Code
Step Code Level 3
Build Time
14 Weeks
Tour the build

Inside the 105A-THE ORBIT.

Hover any photo with a ๐Ÿ“ Plan badge to highlight the matching room on the floor plan.

105A-THE ORBIT โ€” 105A-THE ORBIT
105A-THE ORBIT
Features & Systems

What goes into every 105A-THE ORBIT.

Structure

  • โ€ขEngineered timber floor joists at 19.2" o.c.
  • โ€ขPanelized 2x6 wood frame walls
  • โ€ขEngineered I Joist roof System
  • โ€ขConcrete foundation system

Envelope

  • โ€ขRain screen and vapor barrier
  • โ€ขR-22 wall insulation
  • โ€ขR-40 attic insulation
  • โ€ขDouble-pane windows standard

Mechanical

  • โ€ขCold-climate heat pump
  • โ€ขHRV with HEPA-grade filtration
  • โ€ขHeat-recovery DHW
  • โ€ข200A main service panel (EV-ready)

Interior Finishes

  • โ€ขQuartz countertops
  • โ€ขSoft-close panelized cabinetry
  • โ€ข9' ceilings
  • โ€ขEngineered hardwood floors
Wall System Breakdown

Engineered, panel by panel.

  • โ€ขPanelized wood-frame construction
  • โ€ขFactory-controlled quality at every stage
  • โ€ขContinuous exterior insulation
  • โ€ขBuilt-in service cavity for wiring + plumbing
105A-THE ORBIT โ€” wall system diagram
  • โ€ขEngineered for code compliance + high snow loads
  • โ€ขDouble-pane window upgrade available
  • โ€ข3rd-party tested for air-tightness
  • โ€ขDays, not weeks, to assemble on-site
Detailed Specifications

The full spec sheet.

ComponentMaterialSpecificationNotes
FoundationConcrete Forms8" WallTorch On Membrane Foundation Waterproofing
Floor SystemEngineered I-joists11.875 @ 19'2 OC OSB sub floor glewed and screwed
Exterior Walls 2x6 Wood Stud 9'0 Tall, 16" OC Continuous R-Value >22
WindowsVinyl, Double Pane U 0.18\ SHGC 0.30Triple Pane Upgrade Available
RoofingStanding Seam Metal26-gauge, 16" Panel40- yr Finish Warranty
HVACCold Weather Heat Pump9 SEER / HSPF 12.5 / -25ยฐC
VentilationHigh-Efficiency HRV200 CFM, 80% recoveryHEPA-13 filtration
Performance Comparison

How the 105A-THE ORBIT rates.

Energy Efficiency25%
Lower energy loss than conventional build average
Structural Strength80%
Exceeds NBC 2020 by 40%
Build Speed80%
14 weeks vs. 32 weeks site-built
Air Tightness80%
2.50 ACH50

Annual Operating Costs

New Leaf Conventional Build
JanFebMarAprMayJunJulAugSepOctNovDec
Walkthrough

See it in motion.

Location & Availability

Where we deliver.

Delivery available within 1,500 km of any New Leaf Vision facility. Lead times depend on configuration and current production queue.

Loading mapโ€ฆ
BC\Alberta
Available-8 Week Lead Time
Ontario\Quebec
Available-14 Week Lead Time
Texas
Available-16 Week Lead Time
California
Available-14 Week Lead Time
Mexico-Jalisco
Available-12 Week Lead Time

Start Your Project

Ready to build your 105A-THE ORBIT? Our team will guide you through every step โ€” from site assessment to keys in hand.

Request a Consultation
Chat with us ๐Ÿ‘‹